Basement Apartment & ADU Finishing in Eagle Mountain, UT

Build a legal, comfortable living space below your home. A finished basement apartment can house family or bring in monthly rent that helps cover your mortgage.

Call (801) 555-0147 Get a Free Estimate
Basement ADU apartment living area with a sofa and an adjoining kitchenette

A second living space inside the home you already own

An accessory dwelling unit, or ADU, is a self-contained home built inside or beside your house. In this part of Utah County, the easiest and most affordable ADU is almost always the basement, because the foundation, walls, and roof already exist. We finish that raw space into a private unit with its own kitchen, bathroom, bedroom, and entrance.

Homeowners build basement apartments for two main reasons. The first is income. A finished rental unit can bring in steady monthly rent in a market where housing is tight and demand is high. The second is family. A basement suite gives aging parents or an adult child a private place to live while staying close, which many growing families want as they plan for the years ahead.

What goes into a finished basement apartment

A true apartment is more than a finished basement with a sink. To live in it legally and rent it safely, the unit needs each of these pieces built to code:

  • Full kitchen with cabinets, counters, a sink, and hookups for a range, fridge, and microwave.
  • Bathroom with a shower or tub, a vanity, and proper venting.
  • Bedrooms with egress windows so anyone sleeping below grade has a safe, code-legal way out.
  • Separate entrance, either a walkout door or a private stairwell, so the tenant has their own way in and out.
  • Fire separation between the unit and the rest of the house, which the building code requires for a rental.
  • Independent comfort, including its own heating, cooling, and often a separate laundry hookup.

Cost, timeline, and permits

A basement apartment typically runs about $90,000 to $160,000 or more, depending on the kitchen, the number of rooms, and how much work the separate entrance and egress windows take. Most builds run eight to twelve weeks once the permit clears, since the added plumbing, electrical, and inspections take more time than a simple open finish. We pull the city permit, schedule every inspection, and keep the paperwork clean so your unit is legal and ready to appraise or rent. You can compare this with our full basement finishing pricing on the home page.

Adding a bathroom is one of the larger line items in any apartment build. If you want to see how that part works on its own, read our basement bathroom page.

Basement apartment questions

A basement apartment or ADU usually runs about $90,000 to $160,000 or more. The price depends on the kitchen, the number of bedrooms and bathrooms, and whether a separate entrance and egress windows need to be cut and framed.

Yes, when it is built to code and permitted. A legal rental needs a full kitchen, a bathroom, bedrooms with egress windows, a separate entrance, and proper fire separation. We build to those standards and pull the permit so the unit passes inspection.

A separate entrance is required for most rental units and strongly recommended for an in-law suite. We can build a walkout entrance or a private stairwell entry depending on your lot and foundation.

Ready to price your basement apartment?

Call for the fastest answer, or send the form and we will reach out the same business day.

Call (801) 555-0147

Email: [email protected]

Tell us about your project

📞 Call Now Free Estimate